T/K, Incheon passenger terminal 2nd Phase / 인천항 국제여객부두(2단계) 건설공사 T/K설계 용역 중 BIM해석 검토

고객사 : Samsung C&T

계약기간 : 2013-04

BIM’s information model of Passenger Terminal 2nd made from existing 2D based drawings. Also, 3D model objects were linked with processes linkage. Then BIM based design compared with 2D based design. The purposes of this project are as follows:


Comparing BIM with 2D based drawings. Review of 3D model objects and processes linkages.

 

Crash Detective between Structures.

 

3D BIM was used to check the construction sequence considering the processes linkages.