Asan-Tangjeong 2nd industrial complex Project / 탕정 제2지방산업단지(폐수비상집수조 구조물) 3D Simulation 구축 용역

고객사 : Samsung C&T

계약기간 : 2013-05

BIM’s information model of Water Treatment structure made from existing 2D based drawings. Also, 3D model objects were linked with processes linkage. Then BIM based design compared with 2D based design. The purposes of this project are as follows:

Comparing BIM with 2D based drawings.  Review of 3D model objects and processes linkages.

Review of Safety measure and facilities.

 

Crash Detective between Structures.

3D BIM was used to check the construction sequence considering the processes linkages. Also, a safety measure plan was reviewed.