BIM & Virtual Construction , Shiniwamatsu Electric Power Plant

고객사 : MAEDA E&C

계약기간 : 2014-03

BIM’s information model of Electric power plant is made of existing 2D based drawings. Also, 3D model objects were linked with processes linkage. Then the BIM based design was compared with the 2D based design. The purposes of this project were as follows;

 

-  Comparing BIM with 2D based drawings.

-  Review of 3D model objects and processes linkages

-  Crash Detected between Structures

 

3D BIM was used to check the construction sequence considering the processes linkages