Optimization design of offshore piping system, Rapidly loading and unloading method of bulk carriers

고객사 : Samsung C&T

계약기간 : 2012-11

Taesung S&I made an equipment simulation.Building of 3d virtual study method (BIM) system for practical use for the optimization design of Direct Pumping and Discharging Method, solving the possible problem in advance, construction planning and adequacy of plan refinement, safety equipment:


Completion of detailed Construction Time Schedule. Review of Safety Measure.

Proper Estimation of Equipment Capacity for installation. Comparing 3D BIM with 2D based design. Bulk Carrier Filling ratio of the draft equation system.

3D BIM was used to check the safety measure considering the processes linkages. And proper equipment capacity was estimated from 3D BIM equipment simulation.